
Andrew Molle January 2023 'delayed episode'
Falha ao colocar no Carrinho.
Falha ao adicionar à Lista de Desejos.
Falha ao remover da Lista de Desejos
Falha ao adicionar à Biblioteca
Falha ao seguir podcast
Falha ao parar de seguir podcast
-
Narrado por:
-
De:
Sobre este áudio
WE ARE BACK !
Sorry for the delay folks, we have been re-shuffling and re-structuring the podcast and recording some awesome guests and topics.
This 'delayed' episode was recorded way back in January 2023 with Andrew Molle where we discussed in detail EV Charging Station installation criteria such as design and engineering, site evaluation, handicapped accessibility and much more. Thanks for listening and checking back with us. Please check out our next release in June with Jason Applebaum from EverCharge, its a great episode on overcoming energy distribution problems in EV installations within multi family dwellings
Show Notes
- REVIS EV EPC product 3:45
- EV site selection process 4;35
- Key points on charging station site selection 5:39
- ADA 'accessibility' requirements 5:55
- Largest project to date 7;23
- DCFC or Level II chargers 7:46
- Utilities & Energy Supply concerns 10:36
- Charging Station reliability score 14;38
- What are the top three DCFC's being installed? 17:00
- Will we meet the demands and forecasts for EV infrastructure? 17:53
- Worst horror story in your experience
- What EV do you drive? 29:00
- Whats your next EV? 30:00
- How would you spend the Biden NEVI money? 30:22
- Let's talk about your EV charging related patents 38:38
THANKS FOR LISTENING
For more show information, or if you would like to be a guest on the show contact me at sunpower4u@mac.com. Your comments on the show would be most welcome. I read and answer each one of them,
Thanks Again.
Rue Phillips